Birth
Year 1980
Jan |
ROE, RGO VAXs delivered. |
||||||
|
Many sites expressed dismay at the prospect of Versatecs only, without lineprinters. It was hoped that sufficient funds would be available for a cheap printer at each site. |
||||||
|
Order placed for SIGMA ARGS displays. |
||||||
|
Bob Dickens joined Starlink as Head of Starlink (half time). |
||||||
|
RAL Estimates (80/81) and Forward Look: |
||||||
|
DMY |
8 |
8 |
8 |
7 |
6 |
6 |
|
Staff costs/overhead |
114 |
|
|
|
|
|
|
Recurrent |
351 |
|
|
|
|
|
|
Capital |
650 |
|
|
|
|
|
|
Total |
1115 |
461 |
527 |
529 |
502 |
440 |
Feb 6 |
Outline specification of Starlink environment issued (SAG/3/80). |
||||||
11 |
SAG/4: Most sites felt a lineprinter was needed. Site managers approved - Dave Terrett (MAN), Sid Wright (UCL), Dave King (RGO), Carol Robinson (CAM). |
||||||
14 |
SMM/2 (RAL) |
||||||
|
CAM, MAN VAXs delivered. |
||||||
Mar 4 |
Dave Pearce joined Starlink at RL as assistant to Lawden. |
||||||
22 |
Draft application programmer environmental description issued. |
||||||
28 |
1st Starlink Software Release. |
||||||
|
Bridget Astridge (Starlink secretary RAL) left Starlink. |
||||||
31 |
Bob Fosbury became the first registered Starlink `User' when he signed up at RGO (6 weeks before Barry Kent - claimed as first user in Bul 3). |
||||||
Apr 1 |
Starlink started as a standard project within Computing Division, RL. |
||||||
|
Starlink officially began offering a service to users. |
||||||
15 |
Dave Pearce moved to work on System Software under Walter. |
||||||
28 |
SAG/5: All 6 VAXs delivered; not yet running at RGO and MAN. |
||||||
|
Starlink Bulletin 1 (ENTERPRISE) issued. |
||||||
|
Slavka Cole joined Starlink part time as Starlink Secretary RAL. |
||||||
May 28 |
SMM/3 (ROE) |
||||||
|
1st SIGMA ARGS image display device installed at RAL. |
||||||
Jun 27 |
SAG/6: Bernie McNally now Site Manager at ROE. Local Management Committees set up. |
||||||
Jul |
Starlink Bulletin 2 issued. |
||||||
|
VAX installation at MAN completed - last of the original 6 sites. |
||||||
|
Sites started to communicate via DECNET at 2.4 Kbaud. Remote file access was the only facility supported. |
||||||
|
Initial Site Managers were: CAM - Carol Robinson MAN - Dave Terrett RAL - Lorna Claringbold RGO - Dave King ROE - Bernie McNally UCL - Sid Wright |
||||||
Aug |
Pavelin & Wallace attended `Image Processing in Astronomy' conference at JPL, and visited Kitt Peak, VLA, NRAO (Charlottesville), DEC (Boston). |
||||||
Sep 1 |
Patrick Wallace joined Starlink at RL as Head of Applications Software. |
||||||
4 |
SMM/4 (CAM) |
||||||
23 |
1st release of INTERIM software environment (first Starlink environment). |
||||||
29 |
Meeting to discuss End-User Environment (based on draft SGP/6 produced by Lawden). Decided that command language is to be designed by Walter & Wright (monitored by Shortridge). Timescale - Nov 80: Technical proposal produced; Dec 80: Primer presented to community; Feb 81; Ready. |
||||||
|
Office moves at RAL caused by opening of R31. People have offices in R27 and R31. |
||||||
Oct 6 |
Paper on "The development of Starlink Applications Software" issued. |
||||||
9 |
RAL Estimates (81/82) and Forward Look: |
||||||
|
DMY |
8 |
8 |
8 |
7 |
6 |
6 |
|
Staff costs/overhead |
112 |
112 |
112 |
98 |
84 |
84 |
|
Recurrent |
333 |
350 |
355 |
342 |
392 |
378 |
|
Total |
445 |
463 |
467 |
440 |
476 |
462 |
20 |
SAG/7: VMS 2.0 installed on RAL VAX. Decided not to buy Eigen video system. |
||||||
24 |
Grand Inauguration of Starlink at RAL by Mr D N MacFarlane, Parliamentary Under Secretary at the Dept of Education and Science. |
||||||
Nov |
Starlink Bulletin 3 issued, together with `Glossy Brochure'. |
||||||
Dec 3 |
SMM/5 (RAL) |
1981
Jan 5 |
Mark Banwell joined Starlink as assistant to Lawden. |
|||||
21 |
SAG/8: SRC financial problems affected Starlink - almost impossible to spend money. Printronix printers have been delivered to all sites except RGO & CAM. |
|||||
|
Rodney Warren-Smith (DUR) joined Starlink on 1-year contract to write 2-D Photometry programs. |
|||||
Mar 1 |
Eric Dunford replaced Cliff Pavelin as Project Manager. |
|||||
25 |
SMM/6 (MAN) |
|||||
|
Jeremy Martin joined Starlink at RAL as a student working on graphics with Julian Gallop |
|||||
Apr 21 |
SSC/1: The method of distributing software was changed from large releases at long intervals distributed on magnetic tape to small releases at frequent intervals distributed by network. |
|||||
29 |
SAG/9 |
|||||
|
Althea Wilkinson (MAN) joined Starlink as application programmer. |
|||||
|
Jack Giddings (UCL) joined Starlink as application programmer. |
|||||
|
Mark Banwell (RAL) left Starlink. |
|||||
|
Software Environment SIG set up. |
|||||
May 29 |
Slavka Cole (RAL) left Starlink, her work was taken over by Susan Fuller. |
|||||
Jun 2 |
Steve Yip joined Starlink at RL as assistant to Walter. |
|||||
|
Starlink Bulletin 4 issued. |
|||||
Jul 2 |
SMM/7 (RGO) |
|||||
8 |
SAG/10 |
|||||
15 |
Starlink User Guide binders arrived. Distributed Starlink User Guide 1.0 |
|||||
20 |
Siu Chun Yeung joined Starlink at RL as assistant to Lawden. |
|||||
|
S T Yee joined Starlink at RAL as a student. |
|||||
Aug 1 |
Clive Davenhall (ROE) joined Starlink as application programmer. |
|||||
|
Design of HDS started by Pearce. Anton joins effort in Oct. |
|||||
Sep |
Jeremy Martin (RAL) left Starlink. |
|||||
|
Sue Mitchell (RAL) joined Starlink as Starlink secretary. |
|||||
|
Dave Brownrigg (ROE) joined Starlink as application programmer. |
|||||
|
Doug Tudhope (ROE) joined Starlink as application programmer. |
|||||
Oct 8 |
RAL Estimates (82/83) and Forward Look: |
|||||
|
DMY |
8 |
7 |
7 |
7 |
8 |
|
Recurrent |
425 |
455 |
455 |
480 |
500 |
13 |
SMM/8 |
|||||
31 |
Bob Dickens resigned as Head of Starlink. The posts of Head of Starlink and Project Scientist were merged into that of Project Scientist. |
|||||
|
Eric Dunford moved to IRAS. |
|||||
|
Patrick Wallace became acting Project Manager at RAL. |
|||||
Nov 4 |
SAG/11: |
|||||
|
Ann Sweeney joined Starlink at RAL. Worked with Julian Gallop on GKS. |
|||||
Dec 9 |
Starlink directory structure reorganised. |
|||||
|
Windfall of 150K pounds - Discs, Memory, Terminals. |
Year 1982
Jan 11 |
17th Starlink Progress Meeting (RAL) was cancelled because of snow. This series of meetings stopped being held (last one on 9 Nov 81) and was replaced by a new series of Weekly Progress Meetings in May. |
||||||
|
Windfall of 250K pounds - led to Durham node being purchased. |
||||||
|
Keith Tritton (RAL) joined Starlink as Project Scientist. |
||||||
|
Steve Morris (CAM) joined Starlink as Application Programmer. |
||||||
Feb 24 |
SAG/12: Durham chosen as 7th Starlink node - based on VAX 11/750. |
||||||
|
35 people had applied for the post of Project Manager. |
||||||
Mar |
Durham - Starlink's 7th node opened (Alan Lotts SM). |
||||||
Apr 16 |
RAL VAX hardware moved from plinth in computer hall in R27 to a new room in R30. A new terminal room also became available. |
||||||
27 |
SMM/9 (RAL) |
||||||
|
Starlink Bulletin 5 issued. |
||||||
May 17 |
First Weekly Progress Meeting (RAL) held. Brief minutes were recorded until May 85, after which no formal minutes were kept. |
||||||
22 |
Paper on `Starlink' submitted by Disney & Wallace to Q Jl R astr Soc. |
||||||
Jun 24 |
SAG/13: |
||||||
|
HDS - Data system ready for testing. |
||||||
Jul 23 |
Siu Chun Yeung left Starlink. |
||||||
|
Patrick Wallace confirmed as Project Manager. |
||||||
|
S T Yee (RAL) left Starlink. |
||||||
Aug 24 |
SMM/10 (DUR) |
||||||
|
Starlink Bulletin 6 issued. |
||||||
Sep 9 |
SUG version 2 issued. |
||||||
29 |
VMS 3.0 introduced on RAL VAX. |
||||||
|
Len Culhane replaced Mike Disney as SAG chairman. |
||||||
Oct |
Birmingham - Starlink's 8th node became operational (Billy Wilson SM). |
||||||
|
Most sites now have 4Mbyte memory with 3 at MAN and 2 at BIR and DUR. |
||||||
8 |
RAL Estimates (83/84) and Forward Look: |
||||||
|
DMY |
9 |
10 |
10 |
11 |
11 |
11 |
|
Manpower |
181 |
202 |
202 |
222 |
222 |
222 |
|
Recurrent |
573 |
574 |
574 |
604 |
604 |
604 |
|
Total |
754 |
776 |
776 |
826 |
826 |
826 |
Nov 3 |
SAG/14: Wallace drew attention to Starlink's serious problems with manpower and development of the environment. Decided to set up a `Tiger Team' to produce a written case for more manpower (Culhane, Penston, Kibblewhite, Wallace). |
||||||
11 |
Tiger Team met at RAL. Reported to ASR Board on 24 Nov 82. |
||||||
18 |
SMM/11 (ROE) |
||||||
22 |
Anton Walter died. |
||||||
Dec 21 |
Special Environment SIG meeting at UCL. Abandoned attempt to develop environment by a strong central team. Sid Wright (UCL) given responsibility for the coordination of the implementation effort - within guidelines. |
||||||
|
Starlink Bulletin 7 issued. |
||||||
|
Althea Wilkinson (MAN) left Starlink. |
||||||
|
David Brownrigg (ROE) left Starlink. |
||||||
|
Pat Moore (JOD) joined Starlink as application programmer. |
||||||
|
Jim Peden (BIR) joined Starlink as application programmer. |